{"id":70983,"date":"2026-03-27T11:48:29","date_gmt":"2026-03-27T16:48:29","guid":{"rendered":"https:\/\/simfoni.com\/glossary\/budget-variance\/"},"modified":"2026-03-27T11:48:29","modified_gmt":"2026-03-27T16:48:29","slug":"budget-variance","status":"publish","type":"glossary","link":"https:\/\/simfoni.com\/glossary\/budget-variance\/","title":{"rendered":"Budget Variance"},"content":{"rendered":"<h1>Budget Variance<\/h1>\n<h2>Definition<\/h2>\n<p><strong>Budget Variance<\/strong> is the numerical difference between an approved budget amount and the actual financial result for the same period, category, cost center, or activity, used to identify where performance deviated from the original plan.<\/p>\n<h2>What is Budget Variance?<\/h2>\n<p>Budget Variance shows whether actual results came in above, below, or in line with the financial plan. It is one of the most basic but most important management control concepts because it converts a budget from a static plan into something that can be tested against reality. A budget on its own only states intention. Variance analysis shows what actually occurred.<\/p>\n<p>In practice, budget variance is reviewed for revenue, operating expense, capital expenditure, <a href=\"https:\/\/simfoni.com\/procurement\/\" data-internallinksmanager029f6b8e52c=\"1\" title=\"Procurement\" target=\"_blank\" rel=\"noopener\">procurement<\/a> categories, projects, and departmental cost centers. A variance can be favorable or unfavorable depending on the metric being reviewed. Lower than budgeted spend might be favorable in one context, but a negative signal in another if the underspend reflects failure to execute a critical initiative.<\/p>\n<p>In procurement, Budget Variance matters because purchasing decisions often drive large portions of the actual spend that finance later compares against plan. Understanding the reason for the gap is usually more important than identifying the existence of the gap.<\/p>\n<h2>How to Calculate Budget Variance<\/h2>\n<p>The simplest calculation is actual amount minus budget amount. A positive or negative sign is then interpreted according to the category being reviewed. Some organizations also calculate percentage variance by dividing the difference by the budget amount, which helps compare deviation across categories of different size.<\/p>\n<p>For example, if a category budget was 2,000,000 and actual spend was 2,300,000, the absolute variance is 300,000 and the percentage variance is 15.0%. The numerical answer is straightforward, but useful management depends on understanding the operational cause behind it.<\/p>\n<h2>Types of Budget Variance<\/h2>\n<p>Common types include spending variance, revenue variance, volume variance, price variance, efficiency variance, and timing variance. Some organizations separate controllable variances from uncontrollable variances so management can distinguish between internal execution issues and external market effects such as commodity inflation or regulatory change.<\/p>\n<p>That distinction matters because not every variance should be judged in the same way. A large variance caused by an approved change in business scope requires a different management response than a variance caused by weak purchasing discipline.<\/p>\n<h2>Budget Variance in Procurement<\/h2>\n<p>Procurement teams often influence budget variance through price changes, supplier mix, contract compliance, demand management, volume shifts, payment timing, logistics cost, and market volatility. A category can go over budget because prices rose, because consumption exceeded plan, because spend bypassed preferred contracts, or because business demand changed substantially after the budget was set.<\/p>\n<p>Good procurement analysis therefore separates price effect, volume effect, scope change, and timing effect instead of explaining every gap with a vague statement that spend was higher than expected.<\/p>\n<h2>Why Budget Variance Analysis Matters<\/h2>\n<p>Variance analysis helps management decide whether the budget was unrealistic, whether execution drifted from plan, or whether the business context changed after the plan was approved. It supports accountability because the organization can see where financial performance diverged and which functions or decisions contributed to that divergence.<\/p>\n<p>For procurement, it is especially useful because savings claims, <a href=\"https:\/\/simfoni.com\/sourcing\/\" data-internallinksmanager029f6b8e52c=\"10\" title=\"Sourcing\" target=\"_blank\" rel=\"noopener\">sourcing<\/a> outcomes, and demand behavior can all be tested against the budget position rather than discussed in isolation.<\/p>\n<h2>Limitations of Budget Variance<\/h2>\n<p>A variance number alone does not explain the real issue. The same variance can be caused by pricing, timing, volume, mix, foreign exchange, accounting treatment, or one time events. Budget variance can also be misleading if the original budget was weak or if the actual results reflect a strategic decision that was approved after the budget was finalized.<\/p>\n<p>The analysis becomes useful only when the number is linked to root cause and decision relevance.<\/p>\n<h2>Frequently Asked Questions about Budget Variance<\/h2>\n<h3>Why is Budget Variance important in procurement management?<\/h3>\n<p>It is important because procurement activity often explains a large share of the difference between planned spend and actual spend. Category pricing, demand changes, supplier performance, contract leakage, and logistics shifts can all create material variance. By understanding those drivers, procurement can explain what happened, improve future planning, and identify where spend behavior is moving away from the approved financial intent.<\/p>\n<h3>What is the difference between a favorable and an unfavorable Budget Variance?<\/h3>\n<p>The answer depends on the metric being reviewed. For expense categories, actual spend below budget is often considered favorable and spend above budget unfavorable. For revenue, the interpretation is usually reversed. However, management should not rely only on labels. An underspend may be financially favorable but operationally negative if essential work was delayed or demand assumptions were missed badly.<\/p>\n<h3>How should procurement teams analyze Budget Variance properly?<\/h3>\n<p>They should break the variance into meaningful components such as price, volume, timing, mix, scope change, and compliance effect. A single total variance is too blunt to support action. For example, overspend caused by a commodity spike requires a different response from overspend caused by unapproved supplier choice or poor demand discipline. Good analysis turns the number into a set of explainable business drivers.<\/p>\n<h3>Can a Budget Variance indicate a problem with the budget rather than with execution?<\/h3>\n<p>Yes. A large variance may show that the original budget assumptions were unrealistic, incomplete, or overtaken by events. If demand changed materially, inflation accelerated, or the business approved a new initiative after the budget cycle, the variance may reflect planning limitations more than operational failure. That is why variance review should question both the actual result and the quality of the original plan.<\/p>\n<h3>Should all Budget Variances be corrected immediately?<\/h3>\n<p>Not necessarily. Some variances are temporary timing effects, some are strategically justified, and some are too small to matter. Management attention should focus on material and decision relevant variances, especially those that signal structural issues, weak controls, or deteriorating assumptions. The objective is not to force every actual result back to plan mechanically, but to understand whether the deviation requires corrective action or a revised planning view.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Budget Variance is the gap between what was budgeted and what actually happened. It is used to understand whether spending, revenue, or cost performance deviated from plan and why.<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"template":"","meta":{"give_campaign_id":0,"footnotes":""},"glossary-categories":[],"glossary-tags":[],"glossary-languages":[],"class_list":["post-70983","glossary","type-glossary","status-publish","hentry"],"post_title":"Budget Variance","post_content":"<h1>Budget Variance<\/h1>\n<h2>Definition<\/h2>\n<p><strong>Budget Variance<\/strong> is the numerical difference between an approved budget amount and the actual financial result for the same period, category, cost center, or activity, used to identify where performance deviated from the original plan.<\/p>\n<h2>What is Budget Variance?<\/h2>\n<p>Budget Variance shows whether actual results came in above, below, or in line with the financial plan. It is one of the most basic but most important management control concepts because it converts a budget from a static plan into something that can be tested against reality. A budget on its own only states intention. Variance analysis shows what actually occurred.<\/p>\n<p>In practice, budget variance is reviewed for revenue, operating expense, capital expenditure, procurement categories, projects, and departmental cost centers. A variance can be favorable or unfavorable depending on the metric being reviewed. Lower than budgeted spend might be favorable in one context, but a negative signal in another if the underspend reflects failure to execute a critical initiative.<\/p>\n<p>In procurement, Budget Variance matters because purchasing decisions often drive large portions of the actual spend that finance later compares against plan. Understanding the reason for the gap is usually more important than identifying the existence of the gap.<\/p>\n<h2>How to Calculate Budget Variance<\/h2>\n<p>The simplest calculation is actual amount minus budget amount. A positive or negative sign is then interpreted according to the category being reviewed. Some organizations also calculate percentage variance by dividing the difference by the budget amount, which helps compare deviation across categories of different size.<\/p>\n<p>For example, if a category budget was 2,000,000 and actual spend was 2,300,000, the absolute variance is 300,000 and the percentage variance is 15.0%. The numerical answer is straightforward, but useful management depends on understanding the operational cause behind it.<\/p>\n<h2>Types of Budget Variance<\/h2>\n<p>Common types include spending variance, revenue variance, volume variance, price variance, efficiency variance, and timing variance. Some organizations separate controllable variances from uncontrollable variances so management can distinguish between internal execution issues and external market effects such as commodity inflation or regulatory change.<\/p>\n<p>That distinction matters because not every variance should be judged in the same way. A large variance caused by an approved change in business scope requires a different management response than a variance caused by weak purchasing discipline.<\/p>\n<h2>Budget Variance in Procurement<\/h2>\n<p>Procurement teams often influence budget variance through price changes, supplier mix, contract compliance, demand management, volume shifts, payment timing, logistics cost, and market volatility. A category can go over budget because prices rose, because consumption exceeded plan, because spend bypassed preferred contracts, or because business demand changed substantially after the budget was set.<\/p>\n<p>Good procurement analysis therefore separates price effect, volume effect, scope change, and timing effect instead of explaining every gap with a vague statement that spend was higher than expected.<\/p>\n<h2>Why Budget Variance Analysis Matters<\/h2>\n<p>Variance analysis helps management decide whether the budget was unrealistic, whether execution drifted from plan, or whether the business context changed after the plan was approved. It supports accountability because the organization can see where financial performance diverged and which functions or decisions contributed to that divergence.<\/p>\n<p>For procurement, it is especially useful because savings claims, sourcing outcomes, and demand behavior can all be tested against the budget position rather than discussed in isolation.<\/p>\n<h2>Limitations of Budget Variance<\/h2>\n<p>A variance number alone does not explain the real issue. The same variance can be caused by pricing, timing, volume, mix, foreign exchange, accounting treatment, or one time events. Budget variance can also be misleading if the original budget was weak or if the actual results reflect a strategic decision that was approved after the budget was finalized.<\/p>\n<p>The analysis becomes useful only when the number is linked to root cause and decision relevance.<\/p>\n<h2>Frequently Asked Questions about Budget Variance<\/h2>\n<h3>Why is Budget Variance important in procurement management?<\/h3>\n<p>It is important because procurement activity often explains a large share of the difference between planned spend and actual spend. Category pricing, demand changes, supplier performance, contract leakage, and logistics shifts can all create material variance. By understanding those drivers, procurement can explain what happened, improve future planning, and identify where spend behavior is moving away from the approved financial intent.<\/p>\n<h3>What is the difference between a favorable and an unfavorable Budget Variance?<\/h3>\n<p>The answer depends on the metric being reviewed. For expense categories, actual spend below budget is often considered favorable and spend above budget unfavorable. For revenue, the interpretation is usually reversed. However, management should not rely only on labels. An underspend may be financially favorable but operationally negative if essential work was delayed or demand assumptions were missed badly.<\/p>\n<h3>How should procurement teams analyze Budget Variance properly?<\/h3>\n<p>They should break the variance into meaningful components such as price, volume, timing, mix, scope change, and compliance effect. A single total variance is too blunt to support action. For example, overspend caused by a commodity spike requires a different response from overspend caused by unapproved supplier choice or poor demand discipline. Good analysis turns the number into a set of explainable business drivers.<\/p>\n<h3>Can a Budget Variance indicate a problem with the budget rather than with execution?<\/h3>\n<p>Yes. A large variance may show that the original budget assumptions were unrealistic, incomplete, or overtaken by events. If demand changed materially, inflation accelerated, or the business approved a new initiative after the budget cycle, the variance may reflect planning limitations more than operational failure. That is why variance review should question both the actual result and the quality of the original plan.<\/p>\n<h3>Should all Budget Variances be corrected immediately?<\/h3>\n<p>Not necessarily. Some variances are temporary timing effects, some are strategically justified, and some are too small to matter. Management attention should focus on material and decision relevant variances, especially those that signal structural issues, weak controls, or deteriorating assumptions. The objective is not to force every actual result back to plan mechanically, but to understand whether the deviation requires corrective action or a revised planning view.<\/p>","yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Budget Variance - Simfoni<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/simfoni.com\/glossary\/budget-variance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Budget Variance\" \/>\n<meta property=\"og:description\" content=\"Budget Variance is the gap between what was budgeted and what actually happened. It is used to understand whether spending, revenue, or cost performance deviated from plan and why.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/simfoni.com\/glossary\/budget-variance\/\" \/>\n<meta property=\"og:site_name\" content=\"Simfoni\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SimfoniApps\/\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/simfoni.com\/glossary\/budget-variance\/\",\"url\":\"https:\/\/simfoni.com\/glossary\/budget-variance\/\",\"name\":\"Budget Variance - Simfoni\",\"isPartOf\":{\"@id\":\"https:\/\/simfoni.com\/#website\"},\"datePublished\":\"2026-03-27T16:48:29+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/budget-variance\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/simfoni.com\/glossary\/budget-variance\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/simfoni.com\/glossary\/budget-variance\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/simfoni.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Budget Variance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/simfoni.com\/#website\",\"url\":\"https:\/\/simfoni.com\/\",\"name\":\"Simfoni\",\"description\":\"Spend Intelligence and Spend Automation\",\"publisher\":{\"@id\":\"https:\/\/simfoni.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/simfoni.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\/\/simfoni.com\/#organization\",\"name\":\"Simfoni\",\"alternateName\":\"Simfoni\",\"url\":\"https:\/\/simfoni.com\/\",\"logo\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/budget-variance\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/budget-variance\/#local-main-organization-logo\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SimfoniApps\/\",\"https:\/\/x.com\/simfoniapps\",\"https:\/\/www.instagram.com\/simfoniapps\/\",\"https:\/\/www.linkedin.com\/company\/simfoni\/\",\"https:\/\/www.youtube.com\/@simfoni\",\"https:\/\/g.page\/r\/CTMP26g2qypHEBM\/\",\"https:\/\/www.capterra.com\/p\/206211\/Spend-Analytics\/\",\"https:\/\/www.g2.com\/products\/simfoni-spend-analytics\/\",\"https:\/\/www.glassdoor.com\/Overview\/Working-at-Simfoni-EI_IE3290778.11,18.htm\",\"https:\/\/sourceforge.net\/software\/product\/Simfoni\/\",\"https:\/\/news.google.com\/publications\/CAAqBwgKMMaWxAsw6bHbAw\"],\"description\":\"Simfoni is an AI-powered procurement and spend management platform designed to help enterprises gain complete visibility into organizational spend and turn procurement insight into measurable financial impact. The platform combines advanced spend analytics, intelligent sourcing automation, and tail spend management to enable procurement teams to identify savings opportunities, execute sourcing strategies efficiently, and improve supplier performance across global operations. Built for modern procurement organizations, Simfoni supports Chief Procurement Officers, strategic sourcing leaders, and finance teams who are responsible for driving cost optimization, supplier governance, and operational efficiency. By consolidating procurement data across multiple systems and suppliers, Simfoni provides a unified view of enterprise spend and enables organizations to prioritize sourcing initiatives that deliver measurable savings. Simfoni\u2019s platform integrates spend intelligence with automated sourcing execution, allowing procurement teams to scale sourcing activities without increasing headcount. The system helps organizations manage indirect spend, improve supplier engagement, and strengthen procurement governance through data-driven decision making. Trusted by global enterprises, Simfoni enables organizations to transform procurement from a reactive cost center into a strategic value driver by delivering visibility, automation, and measurable financial outcomes across the procurement lifecycle.\",\"legalName\":\"Simfoni\",\"foundingDate\":\"2015-08-25\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"201\",\"maxValue\":\"500\"},\"address\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/budget-variance\/#local-main-place-address\"},\"telephone\":[\"+1-973-718-7071\",\"+44-208-098-2115\"],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"00:00\",\"closes\":\"23:59\"}],\"email\":\"info@simfoni.com\"},{\"@type\":\"PostalAddress\",\"@id\":\"https:\/\/simfoni.com\/glossary\/budget-variance\/#local-main-place-address\",\"streetAddress\":\"90 Washington Valley Road\",\"addressLocality\":\"Bedminster\",\"postalCode\":\"07921\",\"addressRegion\":\"New Jersey\",\"addressCountry\":\"US\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/simfoni.com\/glossary\/budget-variance\/#local-main-organization-logo\",\"url\":\"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg\",\"contentUrl\":\"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg\",\"width\":1000,\"height\":1000,\"caption\":\"Simfoni\"}]}<\/script>\n<meta name=\"geo.placename\" content=\"Bedminster\" \/>\n<meta name=\"geo.region\" content=\"United States (US)\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Budget Variance - Simfoni","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/simfoni.com\/glossary\/budget-variance\/","og_locale":"en_US","og_type":"article","og_title":"Budget Variance","og_description":"Budget Variance is the gap between what was budgeted and what actually happened. It is used to understand whether spending, revenue, or cost performance deviated from plan and why.","og_url":"https:\/\/simfoni.com\/glossary\/budget-variance\/","og_site_name":"Simfoni","article_publisher":"https:\/\/www.facebook.com\/SimfoniApps\/","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/simfoni.com\/glossary\/budget-variance\/","url":"https:\/\/simfoni.com\/glossary\/budget-variance\/","name":"Budget Variance - Simfoni","isPartOf":{"@id":"https:\/\/simfoni.com\/#website"},"datePublished":"2026-03-27T16:48:29+00:00","breadcrumb":{"@id":"https:\/\/simfoni.com\/glossary\/budget-variance\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/simfoni.com\/glossary\/budget-variance\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/simfoni.com\/glossary\/budget-variance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/simfoni.com\/"},{"@type":"ListItem","position":2,"name":"Budget Variance"}]},{"@type":"WebSite","@id":"https:\/\/simfoni.com\/#website","url":"https:\/\/simfoni.com\/","name":"Simfoni","description":"Spend Intelligence and Spend Automation","publisher":{"@id":"https:\/\/simfoni.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/simfoni.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":["Organization","Place"],"@id":"https:\/\/simfoni.com\/#organization","name":"Simfoni","alternateName":"Simfoni","url":"https:\/\/simfoni.com\/","logo":{"@id":"https:\/\/simfoni.com\/glossary\/budget-variance\/#local-main-organization-logo"},"image":{"@id":"https:\/\/simfoni.com\/glossary\/budget-variance\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/SimfoniApps\/","https:\/\/x.com\/simfoniapps","https:\/\/www.instagram.com\/simfoniapps\/","https:\/\/www.linkedin.com\/company\/simfoni\/","https:\/\/www.youtube.com\/@simfoni","https:\/\/g.page\/r\/CTMP26g2qypHEBM\/","https:\/\/www.capterra.com\/p\/206211\/Spend-Analytics\/","https:\/\/www.g2.com\/products\/simfoni-spend-analytics\/","https:\/\/www.glassdoor.com\/Overview\/Working-at-Simfoni-EI_IE3290778.11,18.htm","https:\/\/sourceforge.net\/software\/product\/Simfoni\/","https:\/\/news.google.com\/publications\/CAAqBwgKMMaWxAsw6bHbAw"],"description":"Simfoni is an AI-powered procurement and spend management platform designed to help enterprises gain complete visibility into organizational spend and turn procurement insight into measurable financial impact. The platform combines advanced spend analytics, intelligent sourcing automation, and tail spend management to enable procurement teams to identify savings opportunities, execute sourcing strategies efficiently, and improve supplier performance across global operations. Built for modern procurement organizations, Simfoni supports Chief Procurement Officers, strategic sourcing leaders, and finance teams who are responsible for driving cost optimization, supplier governance, and operational efficiency. By consolidating procurement data across multiple systems and suppliers, Simfoni provides a unified view of enterprise spend and enables organizations to prioritize sourcing initiatives that deliver measurable savings. Simfoni\u2019s platform integrates spend intelligence with automated sourcing execution, allowing procurement teams to scale sourcing activities without increasing headcount. The system helps organizations manage indirect spend, improve supplier engagement, and strengthen procurement governance through data-driven decision making. Trusted by global enterprises, Simfoni enables organizations to transform procurement from a reactive cost center into a strategic value driver by delivering visibility, automation, and measurable financial outcomes across the procurement lifecycle.","legalName":"Simfoni","foundingDate":"2015-08-25","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"201","maxValue":"500"},"address":{"@id":"https:\/\/simfoni.com\/glossary\/budget-variance\/#local-main-place-address"},"telephone":["+1-973-718-7071","+44-208-098-2115"],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"00:00","closes":"23:59"}],"email":"info@simfoni.com"},{"@type":"PostalAddress","@id":"https:\/\/simfoni.com\/glossary\/budget-variance\/#local-main-place-address","streetAddress":"90 Washington Valley Road","addressLocality":"Bedminster","postalCode":"07921","addressRegion":"New Jersey","addressCountry":"US"},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/simfoni.com\/glossary\/budget-variance\/#local-main-organization-logo","url":"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg","contentUrl":"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg","width":1000,"height":1000,"caption":"Simfoni"}]},"geo.placename":"Bedminster","geo.region":"United States (US)"},"_links":{"self":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary\/70983","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary\/70983\/revisions"}],"wp:attachment":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/media?parent=70983"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-categories?post=70983"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-tags?post=70983"},{"taxonomy":"glossary-languages","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-languages?post=70983"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}