{"id":71041,"date":"2026-03-27T11:49:10","date_gmt":"2026-03-27T16:49:10","guid":{"rendered":"https:\/\/simfoni.com\/glossary\/change-control\/"},"modified":"2026-03-27T11:49:10","modified_gmt":"2026-03-27T16:49:10","slug":"change-control","status":"publish","type":"glossary","link":"https:\/\/simfoni.com\/glossary\/change-control\/","title":{"rendered":"Change Control"},"content":{"rendered":"<h1>Change Control<\/h1>\n<h2>Definition<\/h2>\n<p><strong>Change Control<\/strong> is the formal process used to review, assess, approve, document, communicate, and implement changes to scope, specification, cost, schedule, configuration, or contractual commitments after a baseline has been established.<\/p>\n<h2>What is Change Control?<\/h2>\n<p>Change control exists to prevent unmanaged alteration of what was originally agreed. Once a project, contract, product design, or process baseline is established, changes can still be necessary, but they should not be introduced informally. The business needs a structured method to understand what is changing, why it is changing, what impact it will have, and who has the authority to approve it.<\/p>\n<p>In practice, change control is used in <a href=\"https:\/\/simfoni.com\/procurement\/\" data-internallinksmanager029f6b8e52c=\"1\" title=\"Procurement\" target=\"_blank\" rel=\"noopener\">procurement<\/a>, engineering, projects, IT, manufacturing, and regulated environments where uncontrolled change can create cost overruns, quality issues, contractual disputes, or compliance failure. The method may vary by context, but the principle is consistent, change must be visible, evaluated, and governed before implementation.<\/p>\n<p>In procurement, change control matters because even small modifications to requirements, scope, or delivery assumptions can alter price, timing, liability, and supplier performance materially after a contract is already in motion.<\/p>\n<h2>How Change Control Works<\/h2>\n<p>The process usually starts with a change request that describes the proposed modification and the reason for it. The business then assesses the impact on cost, schedule, scope, quality, risk, technical design, and contractual obligations. Based on that assessment, the change is approved, rejected, deferred, or sent back for clarification.<\/p>\n<p>If approved, the change is documented formally and implemented through the relevant commercial, technical, or operational route. That may involve revised specifications, contract amendments, project rebaselining, new approvals, or supplier instructions.<\/p>\n<h2>The Change Control Process<\/h2>\n<p>A sound process includes identification of the proposed change, impact analysis, decision authority, documentation of the outcome, controlled implementation, and verification that the change has been incorporated correctly. Good change control also maintains a traceable record so the business can later see what changed, when, why, and under whose approval.<\/p>\n<p>This traceability is especially important when the change affects regulated products, complex projects, or supplier claims for additional cost or time.<\/p>\n<h2>Change Control in Procurement<\/h2>\n<p>Procurement teams use change control to manage modifications to contracts, purchase orders, technical requirements, delivery schedules, and pricing assumptions. Without formal control, suppliers may act on informal instructions, business users may assume changes are free, and disputes may arise over whether additional cost or delay is justified.<\/p>\n<p>A strong change control process protects both commercial clarity and supplier accountability by making sure the organization knows exactly what has been altered and what the consequences are.<\/p>\n<h2>Benefits of Change Control<\/h2>\n<p>Change control improves governance, limits scope creep, protects cost and schedule discipline, and creates clearer accountability when requirements evolve. It also reduces the chance that different teams are working to different versions of the truth, which is a common cause of rework and dispute.<\/p>\n<p>For procurement, the benefit is especially strong where supplier contracts involve technical scope, milestones, or payment linked to agreed deliverables.<\/p>\n<h2>Common Failures in Change Control<\/h2>\n<p>Common failures include approving changes informally, skipping impact analysis, failing to document decisions, implementing before approval, and allowing multiple versions of the requirement to circulate simultaneously. These failures can produce cost escalation, contractual ambiguity, schedule slippage, and finger pointing after the fact.<\/p>\n<p>Change control is most valuable when it is followed consistently, not only when the change looks large or politically visible.<\/p>\n<h2>Frequently Asked Questions about Change Control<\/h2>\n<h3>Why is change control important in procurement and supplier management?<\/h3>\n<p>It is important because supplier obligations, prices, timelines, and risk allocation are usually tied to an agreed baseline. If the business changes requirements informally after award, the supplier may incur extra cost, delay, or quality risk without clear commercial treatment. Change control keeps those implications visible, ensures that the right people approve them, and reduces later disputes over what was actually requested and authorized.<\/p>\n<h3>Does every small change need formal change control?<\/h3>\n<p>Not necessarily in the same level of detail, but the organization should have clear thresholds for what can be handled routinely and what requires formal review. The danger is that repeated small changes can accumulate into a major shift in cost, effort, or contractual exposure. Good governance distinguishes between minor administrative updates and substantive changes while still keeping an appropriate record of both.<\/p>\n<h3>What usually happens when change control is weak?<\/h3>\n<p>Costs rise without clear approval, schedules slip, teams work to different specifications, and suppliers may dispute responsibility for the consequences. Informal decisions made under time pressure often seem efficient in the moment but create ambiguity later when invoices, milestones, or quality results no longer match the original agreement. Weak change control therefore usually creates both operational inefficiency and commercial tension.<\/p>\n<h3>Who should approve a change request?<\/h3>\n<p>The approver should be the person or body with authority over the type and scale of impact involved. That may include project leadership, procurement, finance, engineering, quality, or contract owners depending on what is being changed. The critical point is that authority should be defined in advance. If approval paths are unclear, urgent decisions tend to happen informally and the whole purpose of change control is weakened.<\/p>\n<h3>How does change control help prevent scope creep?<\/h3>\n<p>It prevents scope creep by forcing the business to examine each requested change explicitly rather than letting requirements expand gradually without recognition. When every substantive modification is documented and its effect on cost, time, and responsibility is reviewed, it becomes much harder for extra work to accumulate invisibly. The process creates discipline by making change visible and by attaching consequences to it before implementation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Change Control is the formal process used to manage changes after a baseline has been agreed. It helps organizations assess, approve, document, and implement changes without losing control of cost, scope, quality, or schedule.<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"template":"","meta":{"give_campaign_id":0,"footnotes":""},"glossary-categories":[],"glossary-tags":[],"glossary-languages":[],"class_list":["post-71041","glossary","type-glossary","status-publish","hentry"],"post_title":"Change Control","post_content":"<h1>Change Control<\/h1>\n<h2>Definition<\/h2>\n<p><strong>Change Control<\/strong> is the formal process used to review, assess, approve, document, communicate, and implement changes to scope, specification, cost, schedule, configuration, or contractual commitments after a baseline has been established.<\/p>\n<h2>What is Change Control?<\/h2>\n<p>Change control exists to prevent unmanaged alteration of what was originally agreed. Once a project, contract, product design, or process baseline is established, changes can still be necessary, but they should not be introduced informally. The business needs a structured method to understand what is changing, why it is changing, what impact it will have, and who has the authority to approve it.<\/p>\n<p>In practice, change control is used in procurement, engineering, projects, IT, manufacturing, and regulated environments where uncontrolled change can create cost overruns, quality issues, contractual disputes, or compliance failure. The method may vary by context, but the principle is consistent, change must be visible, evaluated, and governed before implementation.<\/p>\n<p>In procurement, change control matters because even small modifications to requirements, scope, or delivery assumptions can alter price, timing, liability, and supplier performance materially after a contract is already in motion.<\/p>\n<h2>How Change Control Works<\/h2>\n<p>The process usually starts with a change request that describes the proposed modification and the reason for it. The business then assesses the impact on cost, schedule, scope, quality, risk, technical design, and contractual obligations. Based on that assessment, the change is approved, rejected, deferred, or sent back for clarification.<\/p>\n<p>If approved, the change is documented formally and implemented through the relevant commercial, technical, or operational route. That may involve revised specifications, contract amendments, project rebaselining, new approvals, or supplier instructions.<\/p>\n<h2>The Change Control Process<\/h2>\n<p>A sound process includes identification of the proposed change, impact analysis, decision authority, documentation of the outcome, controlled implementation, and verification that the change has been incorporated correctly. Good change control also maintains a traceable record so the business can later see what changed, when, why, and under whose approval.<\/p>\n<p>This traceability is especially important when the change affects regulated products, complex projects, or supplier claims for additional cost or time.<\/p>\n<h2>Change Control in Procurement<\/h2>\n<p>Procurement teams use change control to manage modifications to contracts, purchase orders, technical requirements, delivery schedules, and pricing assumptions. Without formal control, suppliers may act on informal instructions, business users may assume changes are free, and disputes may arise over whether additional cost or delay is justified.<\/p>\n<p>A strong change control process protects both commercial clarity and supplier accountability by making sure the organization knows exactly what has been altered and what the consequences are.<\/p>\n<h2>Benefits of Change Control<\/h2>\n<p>Change control improves governance, limits scope creep, protects cost and schedule discipline, and creates clearer accountability when requirements evolve. It also reduces the chance that different teams are working to different versions of the truth, which is a common cause of rework and dispute.<\/p>\n<p>For procurement, the benefit is especially strong where supplier contracts involve technical scope, milestones, or payment linked to agreed deliverables.<\/p>\n<h2>Common Failures in Change Control<\/h2>\n<p>Common failures include approving changes informally, skipping impact analysis, failing to document decisions, implementing before approval, and allowing multiple versions of the requirement to circulate simultaneously. These failures can produce cost escalation, contractual ambiguity, schedule slippage, and finger pointing after the fact.<\/p>\n<p>Change control is most valuable when it is followed consistently, not only when the change looks large or politically visible.<\/p>\n<h2>Frequently Asked Questions about Change Control<\/h2>\n<h3>Why is change control important in procurement and supplier management?<\/h3>\n<p>It is important because supplier obligations, prices, timelines, and risk allocation are usually tied to an agreed baseline. If the business changes requirements informally after award, the supplier may incur extra cost, delay, or quality risk without clear commercial treatment. Change control keeps those implications visible, ensures that the right people approve them, and reduces later disputes over what was actually requested and authorized.<\/p>\n<h3>Does every small change need formal change control?<\/h3>\n<p>Not necessarily in the same level of detail, but the organization should have clear thresholds for what can be handled routinely and what requires formal review. The danger is that repeated small changes can accumulate into a major shift in cost, effort, or contractual exposure. Good governance distinguishes between minor administrative updates and substantive changes while still keeping an appropriate record of both.<\/p>\n<h3>What usually happens when change control is weak?<\/h3>\n<p>Costs rise without clear approval, schedules slip, teams work to different specifications, and suppliers may dispute responsibility for the consequences. Informal decisions made under time pressure often seem efficient in the moment but create ambiguity later when invoices, milestones, or quality results no longer match the original agreement. Weak change control therefore usually creates both operational inefficiency and commercial tension.<\/p>\n<h3>Who should approve a change request?<\/h3>\n<p>The approver should be the person or body with authority over the type and scale of impact involved. That may include project leadership, procurement, finance, engineering, quality, or contract owners depending on what is being changed. The critical point is that authority should be defined in advance. If approval paths are unclear, urgent decisions tend to happen informally and the whole purpose of change control is weakened.<\/p>\n<h3>How does change control help prevent scope creep?<\/h3>\n<p>It prevents scope creep by forcing the business to examine each requested change explicitly rather than letting requirements expand gradually without recognition. When every substantive modification is documented and its effect on cost, time, and responsibility is reviewed, it becomes much harder for extra work to accumulate invisibly. The process creates discipline by making change visible and by attaching consequences to it before implementation.<\/p>","yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Change Control - Simfoni<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/simfoni.com\/glossary\/change-control\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Change Control\" \/>\n<meta property=\"og:description\" content=\"Change Control is the formal process used to manage changes after a baseline has been agreed. It helps organizations assess, approve, document, and implement changes without losing control of cost, scope, quality, or schedule.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/simfoni.com\/glossary\/change-control\/\" \/>\n<meta property=\"og:site_name\" content=\"Simfoni\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SimfoniApps\/\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/simfoni.com\/glossary\/change-control\/\",\"url\":\"https:\/\/simfoni.com\/glossary\/change-control\/\",\"name\":\"Change Control - Simfoni\",\"isPartOf\":{\"@id\":\"https:\/\/simfoni.com\/#website\"},\"datePublished\":\"2026-03-27T16:49:10+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/change-control\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/simfoni.com\/glossary\/change-control\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/simfoni.com\/glossary\/change-control\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/simfoni.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Change Control\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/simfoni.com\/#website\",\"url\":\"https:\/\/simfoni.com\/\",\"name\":\"Simfoni\",\"description\":\"Spend Intelligence and Spend Automation\",\"publisher\":{\"@id\":\"https:\/\/simfoni.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/simfoni.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\/\/simfoni.com\/#organization\",\"name\":\"Simfoni\",\"alternateName\":\"Simfoni\",\"url\":\"https:\/\/simfoni.com\/\",\"logo\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/change-control\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/change-control\/#local-main-organization-logo\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SimfoniApps\/\",\"https:\/\/x.com\/simfoniapps\",\"https:\/\/www.instagram.com\/simfoniapps\/\",\"https:\/\/www.linkedin.com\/company\/simfoni\/\",\"https:\/\/www.youtube.com\/@simfoni\",\"https:\/\/g.page\/r\/CTMP26g2qypHEBM\/\",\"https:\/\/www.capterra.com\/p\/206211\/Spend-Analytics\/\",\"https:\/\/www.g2.com\/products\/simfoni-spend-analytics\/\",\"https:\/\/www.glassdoor.com\/Overview\/Working-at-Simfoni-EI_IE3290778.11,18.htm\",\"https:\/\/sourceforge.net\/software\/product\/Simfoni\/\",\"https:\/\/news.google.com\/publications\/CAAqBwgKMMaWxAsw6bHbAw\"],\"description\":\"Simfoni is an AI-powered procurement and spend management platform designed to help enterprises gain complete visibility into organizational spend and turn procurement insight into measurable financial impact. The platform combines advanced spend analytics, intelligent sourcing automation, and tail spend management to enable procurement teams to identify savings opportunities, execute sourcing strategies efficiently, and improve supplier performance across global operations. Built for modern procurement organizations, Simfoni supports Chief Procurement Officers, strategic sourcing leaders, and finance teams who are responsible for driving cost optimization, supplier governance, and operational efficiency. By consolidating procurement data across multiple systems and suppliers, Simfoni provides a unified view of enterprise spend and enables organizations to prioritize sourcing initiatives that deliver measurable savings. Simfoni\u2019s platform integrates spend intelligence with automated sourcing execution, allowing procurement teams to scale sourcing activities without increasing headcount. The system helps organizations manage indirect spend, improve supplier engagement, and strengthen procurement governance through data-driven decision making. Trusted by global enterprises, Simfoni enables organizations to transform procurement from a reactive cost center into a strategic value driver by delivering visibility, automation, and measurable financial outcomes across the procurement lifecycle.\",\"legalName\":\"Simfoni\",\"foundingDate\":\"2015-08-25\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"201\",\"maxValue\":\"500\"},\"address\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/change-control\/#local-main-place-address\"},\"telephone\":[\"+1-973-718-7071\",\"+44-208-098-2115\"],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"00:00\",\"closes\":\"23:59\"}],\"email\":\"info@simfoni.com\"},{\"@type\":\"PostalAddress\",\"@id\":\"https:\/\/simfoni.com\/glossary\/change-control\/#local-main-place-address\",\"streetAddress\":\"90 Washington Valley Road\",\"addressLocality\":\"Bedminster\",\"postalCode\":\"07921\",\"addressRegion\":\"New Jersey\",\"addressCountry\":\"US\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/simfoni.com\/glossary\/change-control\/#local-main-organization-logo\",\"url\":\"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg\",\"contentUrl\":\"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg\",\"width\":1000,\"height\":1000,\"caption\":\"Simfoni\"}]}<\/script>\n<meta name=\"geo.placename\" content=\"Bedminster\" \/>\n<meta name=\"geo.region\" content=\"United States (US)\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Change Control - Simfoni","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/simfoni.com\/glossary\/change-control\/","og_locale":"en_US","og_type":"article","og_title":"Change Control","og_description":"Change Control is the formal process used to manage changes after a baseline has been agreed. It helps organizations assess, approve, document, and implement changes without losing control of cost, scope, quality, or schedule.","og_url":"https:\/\/simfoni.com\/glossary\/change-control\/","og_site_name":"Simfoni","article_publisher":"https:\/\/www.facebook.com\/SimfoniApps\/","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/simfoni.com\/glossary\/change-control\/","url":"https:\/\/simfoni.com\/glossary\/change-control\/","name":"Change Control - Simfoni","isPartOf":{"@id":"https:\/\/simfoni.com\/#website"},"datePublished":"2026-03-27T16:49:10+00:00","breadcrumb":{"@id":"https:\/\/simfoni.com\/glossary\/change-control\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/simfoni.com\/glossary\/change-control\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/simfoni.com\/glossary\/change-control\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/simfoni.com\/"},{"@type":"ListItem","position":2,"name":"Change Control"}]},{"@type":"WebSite","@id":"https:\/\/simfoni.com\/#website","url":"https:\/\/simfoni.com\/","name":"Simfoni","description":"Spend Intelligence and Spend Automation","publisher":{"@id":"https:\/\/simfoni.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/simfoni.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":["Organization","Place"],"@id":"https:\/\/simfoni.com\/#organization","name":"Simfoni","alternateName":"Simfoni","url":"https:\/\/simfoni.com\/","logo":{"@id":"https:\/\/simfoni.com\/glossary\/change-control\/#local-main-organization-logo"},"image":{"@id":"https:\/\/simfoni.com\/glossary\/change-control\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/SimfoniApps\/","https:\/\/x.com\/simfoniapps","https:\/\/www.instagram.com\/simfoniapps\/","https:\/\/www.linkedin.com\/company\/simfoni\/","https:\/\/www.youtube.com\/@simfoni","https:\/\/g.page\/r\/CTMP26g2qypHEBM\/","https:\/\/www.capterra.com\/p\/206211\/Spend-Analytics\/","https:\/\/www.g2.com\/products\/simfoni-spend-analytics\/","https:\/\/www.glassdoor.com\/Overview\/Working-at-Simfoni-EI_IE3290778.11,18.htm","https:\/\/sourceforge.net\/software\/product\/Simfoni\/","https:\/\/news.google.com\/publications\/CAAqBwgKMMaWxAsw6bHbAw"],"description":"Simfoni is an AI-powered procurement and spend management platform designed to help enterprises gain complete visibility into organizational spend and turn procurement insight into measurable financial impact. The platform combines advanced spend analytics, intelligent sourcing automation, and tail spend management to enable procurement teams to identify savings opportunities, execute sourcing strategies efficiently, and improve supplier performance across global operations. Built for modern procurement organizations, Simfoni supports Chief Procurement Officers, strategic sourcing leaders, and finance teams who are responsible for driving cost optimization, supplier governance, and operational efficiency. By consolidating procurement data across multiple systems and suppliers, Simfoni provides a unified view of enterprise spend and enables organizations to prioritize sourcing initiatives that deliver measurable savings. Simfoni\u2019s platform integrates spend intelligence with automated sourcing execution, allowing procurement teams to scale sourcing activities without increasing headcount. The system helps organizations manage indirect spend, improve supplier engagement, and strengthen procurement governance through data-driven decision making. Trusted by global enterprises, Simfoni enables organizations to transform procurement from a reactive cost center into a strategic value driver by delivering visibility, automation, and measurable financial outcomes across the procurement lifecycle.","legalName":"Simfoni","foundingDate":"2015-08-25","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"201","maxValue":"500"},"address":{"@id":"https:\/\/simfoni.com\/glossary\/change-control\/#local-main-place-address"},"telephone":["+1-973-718-7071","+44-208-098-2115"],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"00:00","closes":"23:59"}],"email":"info@simfoni.com"},{"@type":"PostalAddress","@id":"https:\/\/simfoni.com\/glossary\/change-control\/#local-main-place-address","streetAddress":"90 Washington Valley Road","addressLocality":"Bedminster","postalCode":"07921","addressRegion":"New Jersey","addressCountry":"US"},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/simfoni.com\/glossary\/change-control\/#local-main-organization-logo","url":"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg","contentUrl":"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg","width":1000,"height":1000,"caption":"Simfoni"}]},"geo.placename":"Bedminster","geo.region":"United States (US)"},"_links":{"self":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary\/71041","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary\/71041\/revisions"}],"wp:attachment":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/media?parent=71041"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-categories?post=71041"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-tags?post=71041"},{"taxonomy":"glossary-languages","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-languages?post=71041"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}