{"id":71111,"date":"2026-03-27T11:49:51","date_gmt":"2026-03-27T16:49:51","guid":{"rendered":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/"},"modified":"2026-03-27T11:49:51","modified_gmt":"2026-03-27T16:49:51","slug":"cost-avoidance","status":"publish","type":"glossary","link":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/","title":{"rendered":"Cost Avoidance"},"content":{"rendered":"<h1>Cost Avoidance<\/h1>\n<h2>Definition<\/h2>\n<p><strong>Cost Avoidance<\/strong> is the measurable prevention of a future cost increase, new expense, or unfavorable commercial outcome that would likely have occurred without a specific intervention, negotiation, design change, demand control, or <a href=\"https:\/\/simfoni.com\/procurement\/\" data-internallinksmanager029f6b8e52c=\"1\" title=\"Procurement\" target=\"_blank\" rel=\"noopener\">procurement<\/a> action.<\/p>\n<h2>What is Cost Avoidance?<\/h2>\n<p>Cost avoidance refers to situations in which an organization prevents spend from rising above an expected future baseline. The baseline may reflect an announced supplier price increase, inflation pass-through, a specification choice that would have cost more, a demand pattern that would have triggered extra spending, or a commercial model that would have produced higher charges if left unchanged.<\/p>\n<p>Unlike cost savings, cost avoidance usually does not appear as a visible reduction against current booked spend. Instead, it is recognized by comparing the outcome actually achieved with the higher cost that would reasonably have been incurred under the original scenario. That is why cost avoidance is often more difficult to validate and more sensitive to baseline assumptions.<\/p>\n<p>In procurement, the term is common in categories where negotiations offset market increases, technical teams redesign demand, or contracts are restructured before higher costs materialize.<\/p>\n<h2>How Cost Avoidance Is Calculated<\/h2>\n<p>The basic logic is: expected future cost without intervention less actual or negotiated future cost with intervention equals cost avoidance. The critical step is defining the counterfactual case credibly. That may require documented supplier notices, market index evidence, prior quotations, design specifications, or usage forecasts showing what the business would otherwise have paid.<\/p>\n<p>For example, if a supplier notifies a 7 percent increase on a projected annual spend of $2 million and procurement negotiates the final increase down to 3 percent, the avoided cost is 4 percent of the applicable spend base, assuming the demand forecast and pricing basis are valid.<\/p>\n<h2>Common Sources of Cost Avoidance<\/h2>\n<p>Common sources include blocking proposed supplier price increases, preventing premium freight through planning changes, eliminating unnecessary specifications, consolidating demand before contract award, avoiding duplicate subscriptions, selecting a lower total cost commercial model during <a href=\"https:\/\/simfoni.com\/sourcing\/\" data-internallinksmanager029f6b8e52c=\"10\" title=\"Sourcing\" target=\"_blank\" rel=\"noopener\">sourcing<\/a>, and reducing process failure costs before they hit the income statement.<\/p>\n<p>In each case, the organization avoids incurring a higher future cost rather than removing an already embedded current cost.<\/p>\n<h2>Cost Avoidance vs Cost Savings<\/h2>\n<p>Cost avoidance and cost savings are often reported together, but they are not the same. Cost savings reduce actual spend or budget relative to a current or prior baseline. Cost avoidance prevents a future increase or additional cost from taking effect. Savings are usually more visible in financial statements, while avoidance often requires scenario-based validation and agreement on assumptions.<\/p>\n<p>This difference matters because mixing the two without transparency can distort procurement reporting and create tension with finance.<\/p>\n<h2>Cost Avoidance in Procurement Reporting<\/h2>\n<p>Strong reporting requires a documented baseline, explicit methodology, timing assumptions, and evidence supporting the avoided scenario. Finance teams often ask whether the cost would genuinely have been incurred, whether the avoided amount is one-time or recurring, and whether demand assumptions are stable enough to support recognition.<\/p>\n<p>Without those controls, cost avoidance can be overstated through hypothetical claims that are commercially plausible but not demonstrably attributable.<\/p>\n<h2>Limitations of Cost Avoidance<\/h2>\n<p>The main limitation is evidentiary. Because the organization is proving a cost that did not happen, the quality of supporting data is crucial. Weak baselines, optimistic forecasts, double counting, or unverified price-increase assumptions can make reported avoidance unreliable. It also may not convert into visible budget release even when the intervention was real.<\/p>\n<p>For that reason, many organizations keep cost avoidance in a distinct reporting category from realized savings.<\/p>\n<h2>Frequently Asked Questions about Cost Avoidance<\/h2>\n<h3>Why is cost avoidance harder to validate than cost savings?<\/h3>\n<p>It is harder to validate because it depends on a counterfactual scenario, meaning a reasoned estimate of what would have happened without intervention. That scenario must be supported by evidence such as supplier notices, market benchmarks, demand forecasts, or technical requirements. If the hypothetical baseline is weak, the claimed avoidance becomes difficult for finance or audit teams to accept.<\/p>\n<h3>Can holding a supplier\u2019s price flat count as cost avoidance?<\/h3>\n<p>Yes, if there is credible evidence that the price would otherwise have increased and the avoided increase applies to a defined future spend base. A flat renewal with no prior increase risk is not automatically cost avoidance. The claim depends on documented commercial pressure, index movement, or an explicit supplier request that was negotiated down or neutralized.<\/p>\n<h3>Does cost avoidance always produce budget savings?<\/h3>\n<p>Not necessarily. It may protect a budget from increasing, but it does not always release cash or reduce current booked spend in the period. That is one reason finance teams often distinguish avoided cost from realized savings. The procurement action can still be economically meaningful even if the accounting treatment or budget visibility is less direct.<\/p>\n<h3>What evidence should support a cost avoidance claim?<\/h3>\n<p>Good evidence includes supplier increase letters, previous quotations, market index movements, engineering specifications, forecast volumes, contract clauses, and calculation logic showing the avoided difference. The evidence should demonstrate that the higher-cost scenario was more than a theoretical possibility. Clear documentation is what separates disciplined cost avoidance reporting from unsupported procurement storytelling.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cost avoidance is the prevention of a future cost increase or unnecessary expenditure that would otherwise have occurred. It is measured against an expected cost baseline, not against current spend already being paid.<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"template":"","meta":{"give_campaign_id":0,"footnotes":""},"glossary-categories":[],"glossary-tags":[],"glossary-languages":[],"class_list":["post-71111","glossary","type-glossary","status-publish","hentry"],"post_title":"Cost Avoidance","post_content":"<h1>Cost Avoidance<\/h1>\n<h2>Definition<\/h2>\n<p><strong>Cost Avoidance<\/strong> is the measurable prevention of a future cost increase, new expense, or unfavorable commercial outcome that would likely have occurred without a specific intervention, negotiation, design change, demand control, or procurement action.<\/p>\n<h2>What is Cost Avoidance?<\/h2>\n<p>Cost avoidance refers to situations in which an organization prevents spend from rising above an expected future baseline. The baseline may reflect an announced supplier price increase, inflation pass-through, a specification choice that would have cost more, a demand pattern that would have triggered extra spending, or a commercial model that would have produced higher charges if left unchanged.<\/p>\n<p>Unlike cost savings, cost avoidance usually does not appear as a visible reduction against current booked spend. Instead, it is recognized by comparing the outcome actually achieved with the higher cost that would reasonably have been incurred under the original scenario. That is why cost avoidance is often more difficult to validate and more sensitive to baseline assumptions.<\/p>\n<p>In procurement, the term is common in categories where negotiations offset market increases, technical teams redesign demand, or contracts are restructured before higher costs materialize.<\/p>\n<h2>How Cost Avoidance Is Calculated<\/h2>\n<p>The basic logic is: expected future cost without intervention less actual or negotiated future cost with intervention equals cost avoidance. The critical step is defining the counterfactual case credibly. That may require documented supplier notices, market index evidence, prior quotations, design specifications, or usage forecasts showing what the business would otherwise have paid.<\/p>\n<p>For example, if a supplier notifies a 7 percent increase on a projected annual spend of $2 million and procurement negotiates the final increase down to 3 percent, the avoided cost is 4 percent of the applicable spend base, assuming the demand forecast and pricing basis are valid.<\/p>\n<h2>Common Sources of Cost Avoidance<\/h2>\n<p>Common sources include blocking proposed supplier price increases, preventing premium freight through planning changes, eliminating unnecessary specifications, consolidating demand before contract award, avoiding duplicate subscriptions, selecting a lower total cost commercial model during sourcing, and reducing process failure costs before they hit the income statement.<\/p>\n<p>In each case, the organization avoids incurring a higher future cost rather than removing an already embedded current cost.<\/p>\n<h2>Cost Avoidance vs Cost Savings<\/h2>\n<p>Cost avoidance and cost savings are often reported together, but they are not the same. Cost savings reduce actual spend or budget relative to a current or prior baseline. Cost avoidance prevents a future increase or additional cost from taking effect. Savings are usually more visible in financial statements, while avoidance often requires scenario-based validation and agreement on assumptions.<\/p>\n<p>This difference matters because mixing the two without transparency can distort procurement reporting and create tension with finance.<\/p>\n<h2>Cost Avoidance in Procurement Reporting<\/h2>\n<p>Strong reporting requires a documented baseline, explicit methodology, timing assumptions, and evidence supporting the avoided scenario. Finance teams often ask whether the cost would genuinely have been incurred, whether the avoided amount is one-time or recurring, and whether demand assumptions are stable enough to support recognition.<\/p>\n<p>Without those controls, cost avoidance can be overstated through hypothetical claims that are commercially plausible but not demonstrably attributable.<\/p>\n<h2>Limitations of Cost Avoidance<\/h2>\n<p>The main limitation is evidentiary. Because the organization is proving a cost that did not happen, the quality of supporting data is crucial. Weak baselines, optimistic forecasts, double counting, or unverified price-increase assumptions can make reported avoidance unreliable. It also may not convert into visible budget release even when the intervention was real.<\/p>\n<p>For that reason, many organizations keep cost avoidance in a distinct reporting category from realized savings.<\/p>\n<h2>Frequently Asked Questions about Cost Avoidance<\/h2>\n<h3>Why is cost avoidance harder to validate than cost savings?<\/h3>\n<p>It is harder to validate because it depends on a counterfactual scenario, meaning a reasoned estimate of what would have happened without intervention. That scenario must be supported by evidence such as supplier notices, market benchmarks, demand forecasts, or technical requirements. If the hypothetical baseline is weak, the claimed avoidance becomes difficult for finance or audit teams to accept.<\/p>\n<h3>Can holding a supplier\u2019s price flat count as cost avoidance?<\/h3>\n<p>Yes, if there is credible evidence that the price would otherwise have increased and the avoided increase applies to a defined future spend base. A flat renewal with no prior increase risk is not automatically cost avoidance. The claim depends on documented commercial pressure, index movement, or an explicit supplier request that was negotiated down or neutralized.<\/p>\n<h3>Does cost avoidance always produce budget savings?<\/h3>\n<p>Not necessarily. It may protect a budget from increasing, but it does not always release cash or reduce current booked spend in the period. That is one reason finance teams often distinguish avoided cost from realized savings. The procurement action can still be economically meaningful even if the accounting treatment or budget visibility is less direct.<\/p>\n<h3>What evidence should support a cost avoidance claim?<\/h3>\n<p>Good evidence includes supplier increase letters, previous quotations, market index movements, engineering specifications, forecast volumes, contract clauses, and calculation logic showing the avoided difference. The evidence should demonstrate that the higher-cost scenario was more than a theoretical possibility. Clear documentation is what separates disciplined cost avoidance reporting from unsupported procurement storytelling.<\/p>","yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cost Avoidance - Simfoni<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cost Avoidance\" \/>\n<meta property=\"og:description\" content=\"Cost avoidance is the prevention of a future cost increase or unnecessary expenditure that would otherwise have occurred. It is measured against an expected cost baseline, not against current spend already being paid.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/\" \/>\n<meta property=\"og:site_name\" content=\"Simfoni\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SimfoniApps\/\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/\",\"url\":\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/\",\"name\":\"Cost Avoidance - Simfoni\",\"isPartOf\":{\"@id\":\"https:\/\/simfoni.com\/#website\"},\"datePublished\":\"2026-03-27T16:49:51+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/simfoni.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cost Avoidance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/simfoni.com\/#website\",\"url\":\"https:\/\/simfoni.com\/\",\"name\":\"Simfoni\",\"description\":\"Spend Intelligence and Spend Automation\",\"publisher\":{\"@id\":\"https:\/\/simfoni.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/simfoni.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\/\/simfoni.com\/#organization\",\"name\":\"Simfoni\",\"alternateName\":\"Simfoni\",\"url\":\"https:\/\/simfoni.com\/\",\"logo\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#local-main-organization-logo\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SimfoniApps\/\",\"https:\/\/x.com\/simfoniapps\",\"https:\/\/www.instagram.com\/simfoniapps\/\",\"https:\/\/www.linkedin.com\/company\/simfoni\/\",\"https:\/\/www.youtube.com\/@simfoni\",\"https:\/\/g.page\/r\/CTMP26g2qypHEBM\/\",\"https:\/\/www.capterra.com\/p\/206211\/Spend-Analytics\/\",\"https:\/\/www.g2.com\/products\/simfoni-spend-analytics\/\",\"https:\/\/www.glassdoor.com\/Overview\/Working-at-Simfoni-EI_IE3290778.11,18.htm\",\"https:\/\/sourceforge.net\/software\/product\/Simfoni\/\",\"https:\/\/news.google.com\/publications\/CAAqBwgKMMaWxAsw6bHbAw\"],\"description\":\"Simfoni is an AI-powered procurement and spend management platform designed to help enterprises gain complete visibility into organizational spend and turn procurement insight into measurable financial impact. The platform combines advanced spend analytics, intelligent sourcing automation, and tail spend management to enable procurement teams to identify savings opportunities, execute sourcing strategies efficiently, and improve supplier performance across global operations. Built for modern procurement organizations, Simfoni supports Chief Procurement Officers, strategic sourcing leaders, and finance teams who are responsible for driving cost optimization, supplier governance, and operational efficiency. By consolidating procurement data across multiple systems and suppliers, Simfoni provides a unified view of enterprise spend and enables organizations to prioritize sourcing initiatives that deliver measurable savings. Simfoni\u2019s platform integrates spend intelligence with automated sourcing execution, allowing procurement teams to scale sourcing activities without increasing headcount. The system helps organizations manage indirect spend, improve supplier engagement, and strengthen procurement governance through data-driven decision making. Trusted by global enterprises, Simfoni enables organizations to transform procurement from a reactive cost center into a strategic value driver by delivering visibility, automation, and measurable financial outcomes across the procurement lifecycle.\",\"legalName\":\"Simfoni\",\"foundingDate\":\"2015-08-25\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"201\",\"maxValue\":\"500\"},\"address\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#local-main-place-address\"},\"telephone\":[\"+1-973-718-7071\",\"+44-208-098-2115\"],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"00:00\",\"closes\":\"23:59\"}],\"email\":\"info@simfoni.com\"},{\"@type\":\"PostalAddress\",\"@id\":\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#local-main-place-address\",\"streetAddress\":\"90 Washington Valley Road\",\"addressLocality\":\"Bedminster\",\"postalCode\":\"07921\",\"addressRegion\":\"New Jersey\",\"addressCountry\":\"US\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#local-main-organization-logo\",\"url\":\"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg\",\"contentUrl\":\"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg\",\"width\":1000,\"height\":1000,\"caption\":\"Simfoni\"}]}<\/script>\n<meta name=\"geo.placename\" content=\"Bedminster\" \/>\n<meta name=\"geo.region\" content=\"United States (US)\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cost Avoidance - Simfoni","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/","og_locale":"en_US","og_type":"article","og_title":"Cost Avoidance","og_description":"Cost avoidance is the prevention of a future cost increase or unnecessary expenditure that would otherwise have occurred. It is measured against an expected cost baseline, not against current spend already being paid.","og_url":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/","og_site_name":"Simfoni","article_publisher":"https:\/\/www.facebook.com\/SimfoniApps\/","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/","url":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/","name":"Cost Avoidance - Simfoni","isPartOf":{"@id":"https:\/\/simfoni.com\/#website"},"datePublished":"2026-03-27T16:49:51+00:00","breadcrumb":{"@id":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/simfoni.com\/glossary\/cost-avoidance\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/simfoni.com\/"},{"@type":"ListItem","position":2,"name":"Cost Avoidance"}]},{"@type":"WebSite","@id":"https:\/\/simfoni.com\/#website","url":"https:\/\/simfoni.com\/","name":"Simfoni","description":"Spend Intelligence and Spend Automation","publisher":{"@id":"https:\/\/simfoni.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/simfoni.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":["Organization","Place"],"@id":"https:\/\/simfoni.com\/#organization","name":"Simfoni","alternateName":"Simfoni","url":"https:\/\/simfoni.com\/","logo":{"@id":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#local-main-organization-logo"},"image":{"@id":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/SimfoniApps\/","https:\/\/x.com\/simfoniapps","https:\/\/www.instagram.com\/simfoniapps\/","https:\/\/www.linkedin.com\/company\/simfoni\/","https:\/\/www.youtube.com\/@simfoni","https:\/\/g.page\/r\/CTMP26g2qypHEBM\/","https:\/\/www.capterra.com\/p\/206211\/Spend-Analytics\/","https:\/\/www.g2.com\/products\/simfoni-spend-analytics\/","https:\/\/www.glassdoor.com\/Overview\/Working-at-Simfoni-EI_IE3290778.11,18.htm","https:\/\/sourceforge.net\/software\/product\/Simfoni\/","https:\/\/news.google.com\/publications\/CAAqBwgKMMaWxAsw6bHbAw"],"description":"Simfoni is an AI-powered procurement and spend management platform designed to help enterprises gain complete visibility into organizational spend and turn procurement insight into measurable financial impact. The platform combines advanced spend analytics, intelligent sourcing automation, and tail spend management to enable procurement teams to identify savings opportunities, execute sourcing strategies efficiently, and improve supplier performance across global operations. Built for modern procurement organizations, Simfoni supports Chief Procurement Officers, strategic sourcing leaders, and finance teams who are responsible for driving cost optimization, supplier governance, and operational efficiency. By consolidating procurement data across multiple systems and suppliers, Simfoni provides a unified view of enterprise spend and enables organizations to prioritize sourcing initiatives that deliver measurable savings. Simfoni\u2019s platform integrates spend intelligence with automated sourcing execution, allowing procurement teams to scale sourcing activities without increasing headcount. The system helps organizations manage indirect spend, improve supplier engagement, and strengthen procurement governance through data-driven decision making. Trusted by global enterprises, Simfoni enables organizations to transform procurement from a reactive cost center into a strategic value driver by delivering visibility, automation, and measurable financial outcomes across the procurement lifecycle.","legalName":"Simfoni","foundingDate":"2015-08-25","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"201","maxValue":"500"},"address":{"@id":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#local-main-place-address"},"telephone":["+1-973-718-7071","+44-208-098-2115"],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"00:00","closes":"23:59"}],"email":"info@simfoni.com"},{"@type":"PostalAddress","@id":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#local-main-place-address","streetAddress":"90 Washington Valley Road","addressLocality":"Bedminster","postalCode":"07921","addressRegion":"New Jersey","addressCountry":"US"},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/simfoni.com\/glossary\/cost-avoidance\/#local-main-organization-logo","url":"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg","contentUrl":"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg","width":1000,"height":1000,"caption":"Simfoni"}]},"geo.placename":"Bedminster","geo.region":"United States (US)"},"_links":{"self":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary\/71111","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary\/71111\/revisions"}],"wp:attachment":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/media?parent=71111"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-categories?post=71111"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-tags?post=71111"},{"taxonomy":"glossary-languages","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-languages?post=71111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}