{"id":71348,"date":"2026-03-27T13:37:55","date_gmt":"2026-03-27T18:37:55","guid":{"rendered":"https:\/\/simfoni.com\/glossary\/lead-time\/"},"modified":"2026-03-27T13:37:55","modified_gmt":"2026-03-27T18:37:55","slug":"lead-time","status":"publish","type":"glossary","link":"https:\/\/simfoni.com\/glossary\/lead-time\/","title":{"rendered":"Lead Time"},"content":{"rendered":"<h1>Lead Time<\/h1>\n<h2>Definition<\/h2>\n<p><strong>Lead Time<\/strong> is the total elapsed time between the initiation of a request, order, or production activity and the point at which the required goods, service, or completed output is delivered, accepted, or made available for use.<\/p>\n<h2>What is Lead Time?<\/h2>\n<p>Lead time measures waiting plus processing time across a workflow. In <a href=\"https:\/\/simfoni.com\/procurement\/\" data-internallinksmanager029f6b8e52c=\"1\" title=\"Procurement\" target=\"_blank\" rel=\"noopener\">procurement<\/a>, it can run from purchase requisition through approval, order placement, supplier processing, transport, receipt, and inspection. In manufacturing, it may begin with production release and end with completed output. The concept matters because time delay drives inventory requirements, schedule reliability, customer service performance, and working capital exposure.<\/p>\n<p>Many organizations refer to lead time as though it were a single number, but it is usually made up of several smaller intervals. That distinction matters. A long supplier lead time may actually be caused by slow internal approvals, delayed order release, customs clearance, or inbound inspection bottlenecks rather than the supplier&#8217;s production cycle alone.<\/p>\n<h2>How to Measure Lead Time<\/h2>\n<p>A common calculation is end date and time minus start date and time. The challenge is defining the correct start and end points. For purchase lead time, the start may be requisition approval or purchase order transmission. The end may be goods receipt, invoice match, or stock availability depending on the purpose of measurement. Consistency is essential if lead time is used for planning or supplier scorecards.<\/p>\n<p>Teams often separate total lead time into internal lead time and external lead time. Internal lead time covers demand recognition, approvals, and ordering steps. External lead time covers supplier manufacturing, dispatch, transit, customs, and delivery. This breakdown reveals where delay actually sits.<\/p>\n<h2>Components of Lead Time<\/h2>\n<p>Typical components include administrative time, supplier confirmation time, production or picking time, queue time, transit time, customs or border delay, receiving time, and inspection or put away time. Service lead time may include specification clarification, scheduling, execution, review, and acceptance. Every environment has its own structure, so the metric should follow the real process rather than a generic definition.<\/p>\n<p>Variability is as important as the average. A supplier with a stable fifteen day lead time may be easier to plan around than a supplier that ranges unpredictably between seven and twenty five days. Planning systems therefore often use both average lead time and lead time variability when setting buffers.<\/p>\n<h2>Lead Time in Procurement and Inventory Planning<\/h2>\n<p>Lead time affects reorder points, safety stock, available to promise commitments, and production scheduling. If the measured value is wrong, the business either runs short and disrupts operations or overstocks and ties up capital. Accurate lead time data is therefore foundational for MRP settings, supplier agreements, and service level targets.<\/p>\n<p>Procurement also uses lead time to evaluate supplier responsiveness. Shorter lead times can reduce inventory exposure, but the trade off may include higher cost or lower capacity assurance. The right objective is often reliable lead time, not simply minimum lead time.<\/p>\n<h2>How Organizations Reduce Lead Time<\/h2>\n<p>Reduction starts with process diagnosis. Businesses may streamline approvals, standardize specifications, shorten purchase order cycles, hold framework agreements, localize supply, improve forecasting, or negotiate reserved capacity with suppliers. Digital visibility helps because teams can see where time is being lost rather than pressuring the wrong part of the chain.<\/p>\n<p>Not all lead time can or should be removed. Some compliance checks, quality assurance steps, or consolidation rules exist for good reason. The best lead time improvement removes non value adding delay while protecting control and service quality.<\/p>\n<h2>Frequently Asked Questions about Lead Time<\/h2>\n<h3>What is the difference between lead time and cycle time?<\/h3>\n<p>Lead time measures the total elapsed time from request to completion, including waiting, approvals, queue time, transport, and processing. Cycle time usually focuses on the active time spent performing a task or production step once work has begun. In practice, a process can have a short cycle time but still suffer from a long lead time if items spend days waiting between stages.<\/p>\n<h3>Why does lead time matter in inventory management?<\/h3>\n<p>Inventory policies depend on how long replenishment takes and how predictable that duration is. If lead time is understated, a business may reorder too late and create stockouts. If it is overstated, the business carries more safety stock than necessary. Lead time therefore influences reorder points, working capital, service levels, and the ability to respond to demand shifts.<\/p>\n<h3>Should procurement measure average lead time only?<\/h3>\n<p>No. Average lead time can hide operational instability. A supplier that averages ten days but swings widely from five to twenty days creates more planning risk than a supplier that consistently delivers in twelve days. Procurement should therefore monitor both the central value and the variability, then use that insight in <a href=\"https:\/\/simfoni.com\/sourcing\/\" data-internallinksmanager029f6b8e52c=\"10\" title=\"Sourcing\" target=\"_blank\" rel=\"noopener\">sourcing<\/a> decisions, planning parameters, and supplier reviews.<\/p>\n<h3>Can internal processes increase lead time even when suppliers perform well?<\/h3>\n<p>Yes. Many lead time problems originate inside the buying organization. Slow requisition approval, incomplete specifications, delayed order release, poor master data, and long receiving procedures can add days before or after supplier activity occurs. Breaking lead time into process stages is the best way to distinguish supplier delay from internal administrative delay.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lead time is the total time between starting a request or order and receiving the finished result. In procurement and supply chain work, it affects inventory, planning, service levels, and risk exposure.<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"template":"","meta":{"give_campaign_id":0,"footnotes":""},"glossary-categories":[],"glossary-tags":[],"glossary-languages":[],"class_list":["post-71348","glossary","type-glossary","status-publish","hentry"],"post_title":"Lead Time","post_content":"<h1>Lead Time<\/h1>\n<h2>Definition<\/h2>\n<p><strong>Lead Time<\/strong> is the total elapsed time between the initiation of a request, order, or production activity and the point at which the required goods, service, or completed output is delivered, accepted, or made available for use.<\/p>\n\n<h2>What is Lead Time?<\/h2>\n<p>Lead time measures waiting plus processing time across a workflow. In procurement, it can run from purchase requisition through approval, order placement, supplier processing, transport, receipt, and inspection. In manufacturing, it may begin with production release and end with completed output. The concept matters because time delay drives inventory requirements, schedule reliability, customer service performance, and working capital exposure.<\/p>\n<p>Many organizations refer to lead time as though it were a single number, but it is usually made up of several smaller intervals. That distinction matters. A long supplier lead time may actually be caused by slow internal approvals, delayed order release, customs clearance, or inbound inspection bottlenecks rather than the supplier's production cycle alone.<\/p>\n\n<h2>How to Measure Lead Time<\/h2>\n<p>A common calculation is end date and time minus start date and time. The challenge is defining the correct start and end points. For purchase lead time, the start may be requisition approval or purchase order transmission. The end may be goods receipt, invoice match, or stock availability depending on the purpose of measurement. Consistency is essential if lead time is used for planning or supplier scorecards.<\/p>\n<p>Teams often separate total lead time into internal lead time and external lead time. Internal lead time covers demand recognition, approvals, and ordering steps. External lead time covers supplier manufacturing, dispatch, transit, customs, and delivery. This breakdown reveals where delay actually sits.<\/p>\n\n<h2>Components of Lead Time<\/h2>\n<p>Typical components include administrative time, supplier confirmation time, production or picking time, queue time, transit time, customs or border delay, receiving time, and inspection or put away time. Service lead time may include specification clarification, scheduling, execution, review, and acceptance. Every environment has its own structure, so the metric should follow the real process rather than a generic definition.<\/p>\n<p>Variability is as important as the average. A supplier with a stable fifteen day lead time may be easier to plan around than a supplier that ranges unpredictably between seven and twenty five days. Planning systems therefore often use both average lead time and lead time variability when setting buffers.<\/p>\n\n<h2>Lead Time in Procurement and Inventory Planning<\/h2>\n<p>Lead time affects reorder points, safety stock, available to promise commitments, and production scheduling. If the measured value is wrong, the business either runs short and disrupts operations or overstocks and ties up capital. Accurate lead time data is therefore foundational for MRP settings, supplier agreements, and service level targets.<\/p>\n<p>Procurement also uses lead time to evaluate supplier responsiveness. Shorter lead times can reduce inventory exposure, but the trade off may include higher cost or lower capacity assurance. The right objective is often reliable lead time, not simply minimum lead time.<\/p>\n\n<h2>How Organizations Reduce Lead Time<\/h2>\n<p>Reduction starts with process diagnosis. Businesses may streamline approvals, standardize specifications, shorten purchase order cycles, hold framework agreements, localize supply, improve forecasting, or negotiate reserved capacity with suppliers. Digital visibility helps because teams can see where time is being lost rather than pressuring the wrong part of the chain.<\/p>\n<p>Not all lead time can or should be removed. Some compliance checks, quality assurance steps, or consolidation rules exist for good reason. The best lead time improvement removes non value adding delay while protecting control and service quality.<\/p>\n\n<h2>Frequently Asked Questions about Lead Time<\/h2>\n<h3>What is the difference between lead time and cycle time?<\/h3>\n<p>Lead time measures the total elapsed time from request to completion, including waiting, approvals, queue time, transport, and processing. Cycle time usually focuses on the active time spent performing a task or production step once work has begun. In practice, a process can have a short cycle time but still suffer from a long lead time if items spend days waiting between stages.<\/p>\n<h3>Why does lead time matter in inventory management?<\/h3>\n<p>Inventory policies depend on how long replenishment takes and how predictable that duration is. If lead time is understated, a business may reorder too late and create stockouts. If it is overstated, the business carries more safety stock than necessary. Lead time therefore influences reorder points, working capital, service levels, and the ability to respond to demand shifts.<\/p>\n<h3>Should procurement measure average lead time only?<\/h3>\n<p>No. Average lead time can hide operational instability. A supplier that averages ten days but swings widely from five to twenty days creates more planning risk than a supplier that consistently delivers in twelve days. Procurement should therefore monitor both the central value and the variability, then use that insight in sourcing decisions, planning parameters, and supplier reviews.<\/p>\n<h3>Can internal processes increase lead time even when suppliers perform well?<\/h3>\n<p>Yes. Many lead time problems originate inside the buying organization. Slow requisition approval, incomplete specifications, delayed order release, poor master data, and long receiving procedures can add days before or after supplier activity occurs. Breaking lead time into process stages is the best way to distinguish supplier delay from internal administrative delay.<\/p>","yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lead Time - Simfoni<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/simfoni.com\/glossary\/lead-time\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lead Time\" \/>\n<meta property=\"og:description\" content=\"Lead time is the total time between starting a request or order and receiving the finished result. In procurement and supply chain work, it affects inventory, planning, service levels, and risk exposure.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/simfoni.com\/glossary\/lead-time\/\" \/>\n<meta property=\"og:site_name\" content=\"Simfoni\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SimfoniApps\/\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/simfoni.com\/glossary\/lead-time\/\",\"url\":\"https:\/\/simfoni.com\/glossary\/lead-time\/\",\"name\":\"Lead Time - Simfoni\",\"isPartOf\":{\"@id\":\"https:\/\/simfoni.com\/#website\"},\"datePublished\":\"2026-03-27T18:37:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/lead-time\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/simfoni.com\/glossary\/lead-time\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/simfoni.com\/glossary\/lead-time\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/simfoni.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lead Time\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/simfoni.com\/#website\",\"url\":\"https:\/\/simfoni.com\/\",\"name\":\"Simfoni\",\"description\":\"Spend Intelligence and Spend Automation\",\"publisher\":{\"@id\":\"https:\/\/simfoni.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/simfoni.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\/\/simfoni.com\/#organization\",\"name\":\"Simfoni\",\"alternateName\":\"Simfoni\",\"url\":\"https:\/\/simfoni.com\/\",\"logo\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/lead-time\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/lead-time\/#local-main-organization-logo\"},\"sameAs\":[\"https:\/\/www.facebook.com\/SimfoniApps\/\",\"https:\/\/x.com\/simfoniapps\",\"https:\/\/www.instagram.com\/simfoniapps\/\",\"https:\/\/www.linkedin.com\/company\/simfoni\/\",\"https:\/\/www.youtube.com\/@simfoni\",\"https:\/\/g.page\/r\/CTMP26g2qypHEBM\/\",\"https:\/\/www.capterra.com\/p\/206211\/Spend-Analytics\/\",\"https:\/\/www.g2.com\/products\/simfoni-spend-analytics\/\",\"https:\/\/www.glassdoor.com\/Overview\/Working-at-Simfoni-EI_IE3290778.11,18.htm\",\"https:\/\/sourceforge.net\/software\/product\/Simfoni\/\",\"https:\/\/news.google.com\/publications\/CAAqBwgKMMaWxAsw6bHbAw\"],\"description\":\"Simfoni is an AI-powered procurement and spend management platform designed to help enterprises gain complete visibility into organizational spend and turn procurement insight into measurable financial impact. The platform combines advanced spend analytics, intelligent sourcing automation, and tail spend management to enable procurement teams to identify savings opportunities, execute sourcing strategies efficiently, and improve supplier performance across global operations. Built for modern procurement organizations, Simfoni supports Chief Procurement Officers, strategic sourcing leaders, and finance teams who are responsible for driving cost optimization, supplier governance, and operational efficiency. By consolidating procurement data across multiple systems and suppliers, Simfoni provides a unified view of enterprise spend and enables organizations to prioritize sourcing initiatives that deliver measurable savings. Simfoni\u2019s platform integrates spend intelligence with automated sourcing execution, allowing procurement teams to scale sourcing activities without increasing headcount. The system helps organizations manage indirect spend, improve supplier engagement, and strengthen procurement governance through data-driven decision making. Trusted by global enterprises, Simfoni enables organizations to transform procurement from a reactive cost center into a strategic value driver by delivering visibility, automation, and measurable financial outcomes across the procurement lifecycle.\",\"legalName\":\"Simfoni\",\"foundingDate\":\"2015-08-25\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"201\",\"maxValue\":\"500\"},\"address\":{\"@id\":\"https:\/\/simfoni.com\/glossary\/lead-time\/#local-main-place-address\"},\"telephone\":[\"+1-973-718-7071\",\"+44-208-098-2115\"],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"00:00\",\"closes\":\"23:59\"}],\"email\":\"info@simfoni.com\"},{\"@type\":\"PostalAddress\",\"@id\":\"https:\/\/simfoni.com\/glossary\/lead-time\/#local-main-place-address\",\"streetAddress\":\"90 Washington Valley Road\",\"addressLocality\":\"Bedminster\",\"postalCode\":\"07921\",\"addressRegion\":\"New Jersey\",\"addressCountry\":\"US\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/simfoni.com\/glossary\/lead-time\/#local-main-organization-logo\",\"url\":\"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg\",\"contentUrl\":\"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg\",\"width\":1000,\"height\":1000,\"caption\":\"Simfoni\"}]}<\/script>\n<meta name=\"geo.placename\" content=\"Bedminster\" \/>\n<meta name=\"geo.region\" content=\"United States (US)\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lead Time - Simfoni","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/simfoni.com\/glossary\/lead-time\/","og_locale":"en_US","og_type":"article","og_title":"Lead Time","og_description":"Lead time is the total time between starting a request or order and receiving the finished result. In procurement and supply chain work, it affects inventory, planning, service levels, and risk exposure.","og_url":"https:\/\/simfoni.com\/glossary\/lead-time\/","og_site_name":"Simfoni","article_publisher":"https:\/\/www.facebook.com\/SimfoniApps\/","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/simfoni.com\/glossary\/lead-time\/","url":"https:\/\/simfoni.com\/glossary\/lead-time\/","name":"Lead Time - Simfoni","isPartOf":{"@id":"https:\/\/simfoni.com\/#website"},"datePublished":"2026-03-27T18:37:55+00:00","breadcrumb":{"@id":"https:\/\/simfoni.com\/glossary\/lead-time\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/simfoni.com\/glossary\/lead-time\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/simfoni.com\/glossary\/lead-time\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/simfoni.com\/"},{"@type":"ListItem","position":2,"name":"Lead Time"}]},{"@type":"WebSite","@id":"https:\/\/simfoni.com\/#website","url":"https:\/\/simfoni.com\/","name":"Simfoni","description":"Spend Intelligence and Spend Automation","publisher":{"@id":"https:\/\/simfoni.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/simfoni.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en"},{"@type":["Organization","Place"],"@id":"https:\/\/simfoni.com\/#organization","name":"Simfoni","alternateName":"Simfoni","url":"https:\/\/simfoni.com\/","logo":{"@id":"https:\/\/simfoni.com\/glossary\/lead-time\/#local-main-organization-logo"},"image":{"@id":"https:\/\/simfoni.com\/glossary\/lead-time\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/SimfoniApps\/","https:\/\/x.com\/simfoniapps","https:\/\/www.instagram.com\/simfoniapps\/","https:\/\/www.linkedin.com\/company\/simfoni\/","https:\/\/www.youtube.com\/@simfoni","https:\/\/g.page\/r\/CTMP26g2qypHEBM\/","https:\/\/www.capterra.com\/p\/206211\/Spend-Analytics\/","https:\/\/www.g2.com\/products\/simfoni-spend-analytics\/","https:\/\/www.glassdoor.com\/Overview\/Working-at-Simfoni-EI_IE3290778.11,18.htm","https:\/\/sourceforge.net\/software\/product\/Simfoni\/","https:\/\/news.google.com\/publications\/CAAqBwgKMMaWxAsw6bHbAw"],"description":"Simfoni is an AI-powered procurement and spend management platform designed to help enterprises gain complete visibility into organizational spend and turn procurement insight into measurable financial impact. The platform combines advanced spend analytics, intelligent sourcing automation, and tail spend management to enable procurement teams to identify savings opportunities, execute sourcing strategies efficiently, and improve supplier performance across global operations. Built for modern procurement organizations, Simfoni supports Chief Procurement Officers, strategic sourcing leaders, and finance teams who are responsible for driving cost optimization, supplier governance, and operational efficiency. By consolidating procurement data across multiple systems and suppliers, Simfoni provides a unified view of enterprise spend and enables organizations to prioritize sourcing initiatives that deliver measurable savings. Simfoni\u2019s platform integrates spend intelligence with automated sourcing execution, allowing procurement teams to scale sourcing activities without increasing headcount. The system helps organizations manage indirect spend, improve supplier engagement, and strengthen procurement governance through data-driven decision making. Trusted by global enterprises, Simfoni enables organizations to transform procurement from a reactive cost center into a strategic value driver by delivering visibility, automation, and measurable financial outcomes across the procurement lifecycle.","legalName":"Simfoni","foundingDate":"2015-08-25","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"201","maxValue":"500"},"address":{"@id":"https:\/\/simfoni.com\/glossary\/lead-time\/#local-main-place-address"},"telephone":["+1-973-718-7071","+44-208-098-2115"],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"00:00","closes":"23:59"}],"email":"info@simfoni.com"},{"@type":"PostalAddress","@id":"https:\/\/simfoni.com\/glossary\/lead-time\/#local-main-place-address","streetAddress":"90 Washington Valley Road","addressLocality":"Bedminster","postalCode":"07921","addressRegion":"New Jersey","addressCountry":"US"},{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/simfoni.com\/glossary\/lead-time\/#local-main-organization-logo","url":"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg","contentUrl":"https:\/\/simfoni.com\/wp-content\/uploads\/2021\/10\/Simfoni.com-Logo.jpg","width":1000,"height":1000,"caption":"Simfoni"}]},"geo.placename":"Bedminster","geo.region":"United States (US)"},"_links":{"self":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary\/71348","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary\/71348\/revisions"}],"wp:attachment":[{"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/media?parent=71348"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-categories?post=71348"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-tags?post=71348"},{"taxonomy":"glossary-languages","embeddable":true,"href":"https:\/\/simfoni.com\/wp-json\/wp\/v2\/glossary-languages?post=71348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}